Whole house customization process big decryption

In the past two years, the store with the concept of “custom wood customization” has sprung up all over the major building materials home market. “Whole wood customization” is a major trend in the industry and will lead the new trend of home life. From the market point of view, many well-known companies grab the strategic layout and have joined the ranks of custom wood. With the integration and upgrading of the home building materials market, the concept of self-contained customization has been accepted by many consumers, especially the elites of the society. Customized customization has become a fashion and trend. Therefore, the customization of the whole is very optimistic.

Then Xiaobian today will talk to you about the whole wood customization standardization workflow:

1, design workflow

communication

Before the initial measurement: Communicate with the sales staff, or the designer has been involved in the sales process.

Communication content: the customer's material, style, approximate type and quantity of the project, customer's personality bias, appointment measurement time, customer address, and relevant personnel who need to be present.

During the measurement process: Communicate with the customer or the construction manager.

Communication content: the content, quantity, special requirements, recommendations and programs that need to be rectified.

Whole house customization

measuring

Wooden door measurement

Tools: tape measure, floor plan, water writing pen

First communicate with the construction party or customer, then measure with a marker to record in the door hole will not cover, and finally copy.

Recording standard: hole size (height * width * wall thickness) layer height.

Points and precautions for measuring wooden doors: First of all, we must know the door and line and frame specifications that customers choose.

a, elevation (accurate level, and ceiling height);

b. The position of the wall (whether the door line is guaranteed to be complete and there is no conflict with the wall or other door pockets);

c. Whether there is stone or wallboard in the wall thickness position, the thickness increases and does not increase (recording method is original wall thickness + increase stone thickness or wall board foundation thickness + wall panel thickness);

d, there are seesaws and heads and sleeves, pay attention to the height and corners (whether the floor height has a negative angle);

e. Pay attention to the distance between the line and the wall and other sets of lines (calculate the flying out of the frame and the position of the line);

f. Pay attention to the dimensional error of each face of the hole;

g, pay attention to the customer's special requirements for product size (such as see the light size);

h, to indicate the opening direction;

i. Window cover measurement pays special attention to the hinge position and wall thickness of the outdoor window;

j. If the sliding door is required to not hang down, pay attention to calculate the height of the door opening;

k, invisible door, invisible sliding door, external sliding door, pay attention to the installation method;

l. Pay attention to the size and shape of the door opening required for the mouth shape.

Whole house customization

Wall panel measurement

Tools: tape measure, electronic measuring instrument, floor plan, water writing pen

First record the size on the wall, and finally copy

Recording standards: small size and total size, special shapes draw nodes on the wall.

Measuring wall panel points and precautions:

a, the level of the elevation is accurate, and the height of the ceiling;

b. All dimensions in the entire space should be recorded (eg: ceiling width, power position, hole position);

c. Communicate ground materials and skirting materials (especially easy to ignore the baseboard);

d. Pay attention to the relationship between the height of each floor;

e. Communicate the specific materials of each wall (such as the bathroom and some stone used in public areas);

f. Pay attention to the material used for the corner line of the corner;

g, pay attention to the center point position of the ceiling;

h. Pay attention to the location where the foundation construction needs to be changed;

i. Pay attention to the final position of the door hole or window hole;

j. Pay attention to the method of measuring the dimensions of the horn pack.

Cabinet measurement

Tools: tape measure, floor plan, water writing pen

Measurement cabinet categories and precautions:

a, cabinets and wash cabinets pay attention to the first measurement to reduce the thickness of stone or wall tiles, pay attention to the position of the door cover, pay attention to the water level;

b. Floor heating water separator position, pay attention to the position and height of the ceiling, pay attention to the position of the exhaust pipe, and the position of the power socket;

c. The measurement of the cloakroom wardrobe should pay attention to the height and position of the ceiling, the position of the light source or the socket (the distance between the door and the window cover of the special system);

d. The wine cabinet needs to pay attention to whether the light source and water level are reserved.

Stair type measurement

Tools: tape measure, level, stakeout template, water writing pen

Measuring stair class points and precautions:

a, right angle stairs: step height, step width, step size, corner and platform width;

b. Rotating stairs: step height, step width, step size, corner and platform width, arc lofting, twisting and bending flat iron loft;

c. Overall stairs: stair length, width, height, beam height, platform height;

d. The first step of the stair step is adjusted to a single number, and the first step height of each stair is not higher than 150;

e, pay attention to the triangle and the baseboard;

f. Pay attention to whether the wall has wood veneers or other materials.

Drawing deepening

Wooden doors: wooden doors are equipped with standard styles according to customer requirements, block replacement, window cover and linear change.

Wallboard class: According to the field measurement size, the best effect adjustment ratio and configuration quantity for each wall surface.

Cabinet type: The cabinet is defined according to the functional position and style, and the standard style is applied.

Staircase class: The stairs are initially only used for single-sided drawings plus reference pictures.

Ceiling type: Adjust according to the plane position and the deepened drawing of the façade.

Re-engage with the customer:

Professional attitude to explain the characteristics of the post-deep solution to the customer, do not modify the plan according to the customer's wishes.

Explain to customers the current conflicts in construction and cooperate with sales to make orders.

Program modification:

When the plan needs to be revised, the time should not be too long. The customer's key questions and dissatisfaction should re-deep up two sets of plans.

Initial offer:

The quotation list standard should clearly indicate the location, specification, quantity, unit price, and total price. The quotation method is based on local and customer conditions, such as the split price of the cabinet. The number of lists is not easy to enter and exit with drawings, and it is as accurate as possible.

Business negotiation:

Designers are afraid to discuss prices with customers and assist sales personnel to sign orders.

Out of the base map:

According to the design of the basic map according to the exhibition hall, simple and detailed. When the basic drawing is handed over to the construction party, it needs technical disclosure and requires the construction party to sign the bottom. The foundation only needs to be supervised during the process.

Complex size:

According to the above-mentioned quantity and size requirements, and take photos on the spot to keep the bottom, if it is inconsistent with the basic size, it is necessary to communicate with the construction party in time.

Drawing refinement:

After the drawings are refined, if there are adjustments to the plan, the customer must confirm the confirmation, such as the increase or decrease of the project. If the project is inconsistent with the basic dimensions, it is necessary to communicate with the construction party in time.

Production supervision:

The designer knows more about the products he designs and supervises the crafts, styles, paints and materials.

Installation Instructions:

Focus on the special location, the height of the wall panel installation.

Completion acceptance and filing:

In order to ensure perfect results, the designer should be responsible for the effect.

Project summary:

The customer summed up the evaluation of the designer, summed up the lack of actual results, and summed up the mistakes.

1. Product deepening and unpacking

Product refinement split steps:

Drawing refinement

The final final size and on-site photo of the site must be available prior to the adjustment of the drawings.

Check whether the measurement chart data is clear, and the data with doubts and vulnerabilities and missing items need to be re-scaled.

The lines of the base size in the drawing are represented by a thick red line.

Top view adjustment considerations

a, whether the spacing size and the total length are consistent (there is too much error in the proof);

b. Whether the thickness of the wall or the depth of the concave wall has been added to the thickness of the wallboard (the ruler generally indicates whether to increase the thickness of the wallboard);

c. Refine the product node diagram of the cabinet, door, door cover, curtain box cover, wall corner or pillar position;

d. Where there is a line, pay attention to the distance of the reverse line of the room and the wall. If it is not enough, you can adjust or change the size of the line;

Ceiling diagram adjustment notes

a, the relationship between the ceiling and the background (if it is not necessary to remind Party A);

b. Whether there is any conflict between the tuyere, the light source and the ceiling product, or the product installation and production (if there is also need to coordinate with Party A);

c. After adjusting the size, refine the node diagram of the ceiling and the product;

d. After the drawing is adjusted, the ceiling image must be mirrored and turned into a bottom view;

Elevation adjustment notes

a, according to the adjusted top view node map and the measured size simultaneously adjusted;

b. Pay attention to whether there is any conflict between the socket, the switch and the product (if there is a conflict, whether it can be processed on site or coordinated with Party A);

c. Is the size of the equipment provided by Party A related to the product complete and accurate, and check whether there is any conflict (such as furniture, wall lamp, soft bag, electrical appliance, etc.);

d. Whether the skirting line of all rooms goes with the ground, yes, the customer needs to provide the size, (whether the top line of the cabinet to the top is open);

e. Pay attention to whether the size of the re-checked layer is completed (the floor panel specification) (whether the floor height has a drop);

f. The position of the wall panel against the wall is reserved according to the installation method;

g, pay attention to the relationship between the background and the ceiling;

h. Check whether the elevation of each façade and the specifications of the lines are uniform.

2, product split

Wall board class splitting precautions

a, the split line is represented by a thick pink line;

b. When disassembling, pay attention to specifications that should not be too large or too trivial;

c, transfer and handover position pay attention to the relationship and size (yang angle group is good);

d. Try to avoid exposure and minimize the seam position;

e, number as much as possible according to the floor, room, quantity code, such as the second floor bedroom, edit 2W-01...;

f. The order of numbers is numbered in the same category, the identical product numbers are unified, and the quantity is indicated on the order;

g, number font needs to be displayed easily and easily recognized, preferably the background is covered and placed in the correct position;

h, check the number of wall panels with or without leakage number;

Line class splitting considerations

a, the line needs to be decomposed according to the size of each room, to minimize the seam (length needs to consider transport and handling upstairs);

b, the regular line needs to be prepared (loss or damage);

c, Xiaoyangjiao lines need to be combined in the factory;

d, the thickness relationship between the waist line, the baseboard and the door sleeve line;

e, the shape of the alien line pay attention to the direction, try not to break up;

f. Irregular large carved lines calculate the position of the flower;

Wooden door splitting precautions

a, pay special attention to whether the wall thickness has wall thickness (height / width / wall thickness / door);

b. Where there is a wall skirt, the door and window sets need to be reversed or closed;

c, the child door, the double door, the art glass door specifically indicate the opening direction;

d. The customer should pay attention to the special requirements of the door leaf or the light size;

e, pay special attention to the color and direction of the door of Yin and Yang;

f, the head and the distance between the line and the wall;

Whole house customization

Cabinet class splitting precautions

a, regular product parts can be marked with code or text, unconventional product parts need to be split;

b. As far as possible, the cabinet to the top should be split by the movable top line, or the upper and lower cabinets should be closed (if the cabinet is not top);

c. Whether the specifications of the cabinet hardware equipment are consistent (such as metal basket, pants rack, lattice pumping, wearing mirror, safe, etc.);

d. After the internal functions of the cabinet are refined, the customer needs to confirm (according to customer requirements);

e. Consider whether the cabinet installation is blocked;

Drawing the order considerations

Sometimes you need to specify the order description: materials, paint process requirements, woodworking process requirements, factory configuration hardware, packaging and transportation requirements, installation process requirements, etc.

a. The drawing home page prepares the general order specification according to the requirements of the contract and the customer after communication;

b. The drawings must be concise and clear, the data is clear, and the terminology is clear (each drawing is not easy to be too full or too small);

c. The order of drawing numbers shall be in order (eg: first wallboard, line, wooden, cabinet);

d. Before the drawings are placed, they must be printed out for review (check whether the font size and graphics of the drawings are clear, whether the dimensions of the drawings are offset and shifted, and the drawings are converted to jpg format after the completion of the review (the image format avoids changes in the electronic version, but ensures Print out clearly) electronic documents as a reference;

e. After the factory order member has completed the list, it is necessary to check whether the list and the drawings are consistent (generally, there are separate orderers in the factory);

Whole house customization

3. Standardized drafting process

1. Analyze structural problems (technical)

2, three-sex analysis

a) Interface analysis

b) obstacle analysis

c) Invisible risk analysis

3, aesthetic design (aesthetic perspective to assist design)

4, understand the user's personality characteristics and preferences

5, the user's living habits (designed through life)

6, the user's aesthetic point of view (style design)

7, the user's family structure (using functional design)

8, the entire environmental situation analysis

9, considering the yield rate

10, transportation, packaging, installation, maintenance, etc.

Document.body.oncopy = function () { setTimeout( function () { var text = clipboardData.getData("text"); if (text) { text = text + " This article comes from China Wooden Door Network, China's well-known wooden door industry portal Website! (http://) Detailed reference: "+location.href; clipboardData.setData("text", text); } }, 100) }

Bedroom Furniture

Bedroom Furniture,Upholstery Furniture,Upholstered Fabric Bed,Upholstered Headboard And Frame

DONG GUAN CITY CHING XIN INDUSTRIAL CO LTD , https://www.chingxin.com